Ann Sacks Kelly Wearstler custom floors, in production

Sample received from production

The custom floors have been in production for approx 4 weeks now and I just got my first peek at them! I misunderstood the timeline and had thought they would be delivered in 4-6 weeks, but both the production process AND shipping EACH take 4-6 weeks. Needless to say, the floors are not here yet!

As a reminder, the rendering of the stones we selected, for our specific floorplan, looked like this:

Production just came back with a swatch of floor for approval before they start to produce the entire footprint. Here it is:

It has a nice neutral look to it, while being bold and forward. It will go really well in this traditional home. The only stone that is missing from this swatch is the rubicon black (stripe), but otherwise this is the finished product.

I’m very excited for these floors to be installed.

Ann Sacks Kelly Wearstler custom floors

The master bathroom is all white subway and hex tiles, similar to the guest bathroom. While the subway walls will remain, we opened up the space by removing the privacy wall and will completely replace the hex floors. Here is the master bathroom today:

The master bathroom today has two sinks and hex floors that we will replace
The privacy wall will be removed to give more space

The floors in process are a custom Ann Sacks, Kelly Wearstler Liason design. The pattern is part of the Liason Collection and called Hillcrest. The pattern looks like this:

AnnSacks_LiasonHillcrest_CustomColor
Ann Sacks, Kelly Wearstler Hillcrest Tile

I’m working on custom color choices with the Chicago showroom and have begun to narrow down our choices. Initially we narrowed down to Chinese Verde Luna, Travertino Red, Calacatta Oro and Rubicon. When the lot samples arrived the Verde Luna was brighter than I expected so we went back to the drawing board to look at more samples.

Initial cast of colors for custom Ann Sacks / Kelly Wearstler Liason floor design
Initial floorplan pattern sketch

There are three boards of colors to choose from for custom Kelly designs at Ann Sacks that give a broad array of options for different looks and styles. Here is the full spectrum of color choice – it is a great selection with some beautiful stones.

Kelly Wearstler for Ann Sacks
Neutral stone choices for Kelly Wearstler designs at Ann Sacks 1/3
Kelly Wearstler for Ann Sacks
Neutral stone choices for Kelly Wearstler designs at Ann Sacks 2/3
Kelly Wearstler for Ann Sacks
More colorful stone choices for Kelly Wearstler designs at Ann Sacks 3/3

Each stone can either be polished or honed, adding to the choices, but today we decided to lose the green stripe, pull in the Travertino Red stripe and incorporate the warm and neutral Zebrino stone into the design. The stones will be a mix of polished and honed.

We narrowed down to a more neutral palette, pulling in the Travertino Red stripe
Kelly Wearstler for Ann Sacks
A more neutral palatte with a Travertino Red stripe resting on the Zebrino

These color selections have been sent back to the Ann Sacks team to be mocked up for production while the bathroom demo is underway!

 

[A tiny] Bathroom remodel

This bathroom is teensie. Let’s flash back to the listing photo:

Small Guest Bathroom, Tiny Bathroom renovation
Listing photos are always so perfect

Here is the bathroom today:

Bathroom Guest
The bathroom, prior to renovation

The bathroom is nice, but it doesn’t have a tub and the floor tiles are not our favorite, so I will change them when we add the tub. The shower hardware is mixed brands and even has two “hot” knobs instead of one hot and one cold (why did that happen!?). We will keep the sink and toilet to save some money on this project.

I will be working in a space that is 6’1″ x 4’10” at its longest points.

Gold Coast Small Bathroom Renovation
The bathroom is approximately 73″ deep

And I will be fitting in a bathtub.

Gold Coast bathroom renovation
Width is 58″ from tile to tile, and the standard bathtub is 60″

We have started shopping for tiles and I’m tired of the all whites and grays. I am really working on getting away from what we’ve been seeing and selecting different things for this home.

Basketweave Tiles
This is NOT what I will be doing

Here are some different tile patterns that I liked at Waterworks (with different color schemes):

 

 

I also like the Kelly Wearstler for Ann Sacks tiles. These patterns are so fun.

AnnSacksLiaison_DohenySmall_StoneCollection
Kelly Wearstler for Ann Sacks Doheny Small
ANNSACKS_KellyWearstlerLiaison_Collection1
Kelly Wearstler for Ann Sacks Liaison Collection

We will add a better vanity and have already removed the existing mirror and shelf. I will be selling everything that is salvageable on Ebay and Chairish.

Gold Coast bathroom update
 The shelf and mirror have been removed and will be replaced with a lit medicine cabinet.

There are two medicine cabinets that I think are great for this space. The Astoria Medicine Cabinet from Restoration Hardware has a 1930’s look and is $455, or $364 for members for the polished chrome. It is 18 1/4″ wide x 30″ tall.

Astoria
The small Astoria Medicine Cabinet from RH is the right dimension and has a 1930s look

The Kohler Verdera Medicine Cabinet is $911 (or $683.25 if you shop at Build.com) and is 20″ wide x 30″ tall. It has awesome lighting and would remove the necessity to put a light over the mirror, which would be nice. And yes – these lights DO make you look better!

Verdera
Kohler Verdera has electrical in the cabinet which helps keeps counters clean

Instead of replacing the toilet which is from the Duravit 1930’s Collection, we have ordered the soft close cover and will keep it and the matching pedestal sink.

Gold Coast bathroom update
We have removed the hooks and will replace the base board with a ceramic version

To replace the toilet and sink it would cost $1,500+ so we are keeping the budget lower by keeping. However, we will replace the sink tap and drain.

Gold Coast bathroom update
The mirror and shelf have been removed the sink hardware will be replaced (the finish is chipped)

We will be replacing all of the sink and shower hardware, adding the bath filler and tub, re-tiling the floors, replacing the toilet seat and adding a medicine cabinet. My next step is to have my plumber price out this work and confirm that we can fit a 60″ bathtub in the space!