The Master Bedroom wallpaper has been stripped along with the front entry. Everything looks yellow and pink and smeared today, but soon it will look beautiful! Here is the gap between the bay windows where we will place the dresser, that is currently being constructed in Tennessee.

It is always odd to see what lies beneath wallpaper. I would have expected a single color of paint, but that was certainly not the case in this house. We have found everything from pink to green, and nothing that we expected.


The baseboards were never properly finished and they don’t look good today, but a coat of paint is all these baseboards need to look fresh and new.

The ceiling fixture in this room will be updated with a flush mount Ralph Lauren glass and brass piece.

The lighting fixture was on sale for 20% off from Circa Lighting, but painfully back-ordered for months, as it was ordered in December and still has not shipped. We are also using a pair of the Ralph Lauren Allan single sconces in the hallway which will help pull the lighting together.
One thought on “Master bedroom, in process”